- Related Articles
- FIRST THINGS
- Gone like the Buffalo
- ON THE ROAD
Restoring a large steam engine from boneyard-to-show condition is not without its headaches. Craig says the amount of time and effort such a project requires is surprising. He worked 10-hour days and spent 700 total hours on the FFA project. The job was physically tedious, often requiring him to spend a lot of time in awkward positions.
"I spent 48 hours in the crown sheet fire box alone, welding it together," Craig says. "Your legs get stiff, you can't breathe even though there's a fan - and my girlfriend had to pull me out after I got stuck."
Craig says if he had it to do over, he'd start earlier on the project: he spent 39 straight hours finishing it, and the work book, before the deadline.
For more information, contact Craig at Craig's Restoration and Repair, 1029 Vail Ave., Durant, IA 52747; (563)299-1808.





