MEMORIES OF THE PAST

By Roy W. Ross
Published on January 1, 1953
1 / 4
Mule operating a tread power at the Mt. Pleasant Reunion. This was a trick mule. She played in Rodeos and Wild West Shows. A lovable little critter. She responded readily to the owners soft words.
Mule operating a tread power at the Mt. Pleasant Reunion. This was a trick mule. She played in Rodeos and Wild West Shows. A lovable little critter. She responded readily to the owners soft words.
2 / 4
A one inch scale Huber built by Jacob Frunk of Box 27, Olivia, Minn. You will note it is balanced on a Teter Board. Frank says, I can do that too.
A one inch scale Huber built by Jacob Frunk of Box 27, Olivia, Minn. You will note it is balanced on a Teter Board. Frank says, I can do that too.
3 / 4
The League of States as seen at the Mt. Pleasant Reunion. Each person is from a different state except that in so me cases husband and wife are from the same state. You pick them out.
The League of States as seen at the Mt. Pleasant Reunion. Each person is from a different state except that in so me cases husband and wife are from the same state. You pick them out.
4 / 4
August first, 1952 scene at Ed. Schmid gall's, Cooper Station, near Washington, III. Amer Cook's Case engine with Joe Wisehaupt operating the outfit
August first, 1952 scene at Ed. Schmid gall's, Cooper Station, near Washington, III. Amer Cook's Case engine with Joe Wisehaupt operating the outfit

That fall, after work was completed, I had been in
correspondence with the J. I. Case manager at Regina, and through
his efforts arrangements were made allowing me to go to the factory
at Racine for the winter, to work on boiler construction. It was a
real chance for my apprenticeship, and always will I remember that
winter. It was the first time away from home and everyone was so
good to me, which was typical of the older days. That was one
winter that taught me a lot, and opened the way for two more to
follow at the Case works. Later, in 1911, the winter was spent at
the Reeves boiler factory.

Came 1908, and that year made up for the losses in 1907. The
crop was equal to two average years, and even the fall weather was
grand. Threshing started August 29 that year and we threshed until
the September 21st storm without a break of any kind. At that time
the weather stopped us for ten days and then we started again and
ran steady until December 23rd. Everyone wanted a week off, so as
the grain we were threshing was stacked, Dad decided to close down
until January 2nd. By that time the weather had gotten cold, so
arrangements were made with farmers to change work and we would put
on a three fourths day running from 9 A. M., to 5 P. M. which was
done until we finished on March 3rd, 1909. Ten days later I was
called in for examination by the local Boiler Inspector and being
successful, was then a full-fledged engineer with a certificate.
Previous to that, I had operated on a temporary paper to comply
with the act.

By this time, considerable interest was coming to the front in
steam plowing, and although we had used the little Case for some
light work, it was decided to go on until the end of 1909. By doing
that it gave us the chance during the summer to attend the Winnipeg
Exhibition where all types and sizes of every make engine, both gas
and steam, was in operation, and by seeing them operate, would help
us decide on what was needed or more suitable. This helped us pick
out the first Reeves 32-100 cross compound.

The fall of 1909 came and that fall we had our first fire. It
had rained during the night, just enough to make it tough in the
morning at the start. The machine was at a new set at the edge of a
coulee where there was a heavy covering of grass and the engine was
really barking and using straw for fuel. A spark had gotten to
smoldering in the grass and with the wind blowing it got a start.
However, one thing that had always been done at the very start of
each year, came in good this morning. Each man had been trained and
told what to do and where to go. We always had at least two
practice drills during the first week and our standing instructions
were to double the men’s pay that day to save property. So this
morning as the fire gained headway, four men took the separator
tongue and slowly pulled the machine out of the belt and then
everyone turned to the fire. By that time I had the engine over by
the bin and the pump did the rest. We lost half art hour in time,
and half a load of bundles. Later on this same year, we had a
second fire, but no toss except a stack of straw. The fire started
right on top of the pile, and there was a lot of foxtail in the
straw, so it went very quickly. But there were no losses.

That fall work was finished up by the end of November and as a
great demand for grinding grain seemed to come, the old Case 20 was
run into town and put in a shed and ground grain three days a week
until the end of January in 1910.

Early in 1910, an order for a new Reeves 32-110 cross compound
was given, to be followed later on toy an order for an Avery
‘Yellow Fallow’ 40 inch thresher. No we were in the plowing
game. The first plows handled were 12 bottom Cockshutt breaking
sod. By now was had two crews running night and day from midnight
Sunday until midnight Saturday. The water was quite a problem, and
sometimes we had to wash out on Wednesdays to keep our boiler is
shape. On the average, one and three quarter tons of steam coal
were used each 12 hour shift. We had 2 water teams and a coal team
going and a blacksmith on hand, a cook in the cook house, and
included a sleeping car with the outfit. Generally we would break
new land until the end of June and then would back set two year old
land for the next years crop.

Online Store Logo
Need Help? Call 1-866-624-9388